The firm is comparing two mutually exclusive projects. The crossover point is 15%. The firm has determined that it should accept project A if the required rate of return is 11%. Therefore, the firm should:
- always accept project A.
- accept project B if the required rate of return is 16%.
- accept project B if the required rate of return is 10%.
- accept project B if the required rate of return is 12%. Get Finance homework help today